top of page
Featured Posts

The Horseshoe Curve Branch Line

My N-Scale Layout depicting the Horseshoe Curve during the late reign of the PRR, early PC years

Search

HCW: Penn Central "F" locomotive inspection

  • Writer: Mr. & Mrs. Putnick
    Mr. & Mrs. Putnick
  • Apr 8, 2017
  • 1 min read

Around 8:30 am, Penn Central dispatched a pair of "F" diesel locomotives to inspect the track around the curve. Exactly 10 minutes later, rumbling was heard on track 1 as two aging locomotives descended into the Horseshoe Curve. In the front was a Penn Central F7, and the trailing units was an Ex-Pennsy F9 unit. Once the two had made their inspection rounds, more freight pulled through the curve about an hour later.

 
 
 

Comments


Recent Posts
Archive

© The Horseshoe Curve Branch Line
Proudly made with Wix.com

bottom of page