HCW: Old & New Pennsy Diesel Power
Around noon, three Pennsylvania RR diesel locomotives were spotted returning from Pittsburgh, descending into the Horshoe curve with a...
HCW: Pennsy dual early diesel power
As sunset was rapidly approaching, 2 early diesels operated by the Pennsylvania RR entered the Horseshoe Curve, tugging a long line of...
HCW: Dual Diesel-Loco inspection
A couple minutes before the 7:30 arrival of the "Broadway Limited" passenger train, two diesel locomotives passed through the Horshoe...
HCW: 1950 Power at the Curve
The date is 1950. A shot is snapped in the hills of the surrounding Alleghenies peering down at steam locomotive power operating at the...
HCW: Pennsy GP9 & C-Liner duo
Around 5:30 A.M., as a load of gondolas (some full and some empty) passed by on track 4, returning to Altoona, a rumble was heard coming...