Concluding the work at the second Kittanning Reservoir
Recent work on the layout included completing the job at the second Kittanning Reservoir. First, the Woodland Scenics Realistic Water product was poured into the reservoir and allowed to dry overnight-
The next day, I set to finish adding clump foliage around the fringes, which turned out to be an utter success-
This completes the heavy labor on the Horseshoe Curve Branch Line - the remaining additions will be therefore easier to conclude; these are the adding of signal bridges in two locations along the tracks as well as attaching material to serve as skirting, to cover the perimeter of the table.